Akron nepheline processing plant

Client: SY-308-1, JSC
Location: Great Novgorod
Start: 2012 year
Completion: 2013 year

Lenmontag LLC accepted a subcontract for the manufacturing and installation of metal structures at the chemical industry enterprise. The construction site was a sector No. 1of nepheline processing  at the Akron plant in the city of Great Novgorod. Prepared steel structures are intended for further construction and installation works.

Results: metal structures for the main body of the industrial workshop are manufactured, delivered, assembled on-site. Steel elements are left prepared for the placement of nepheline processing equipment. Routes for external engineering networks (pipelines) were built. Auxiliary construction works (earthworks, works on reinforced concrete elements) were completed.