Multipurpose off-coast basin

Client: Trust No. 68, JSC
Location: St. Petersburg
Start: 2013 year
Completion: 2014 year

We have conducted a set of works within the manufacturing and installation of metal structures during the construction of a technically sophisticated object, which is a covered offshore pool for technical shipbilding tests. The total mass of fabricated and assembled metal structures amounted to 2020 tons.

Results: Lenmontag produced and installed on-site the metal structures for the outer hull and hangar of the offshore basin. We performed the installation of connecting elements and anchor groups, the frame is fully prepared for the construction of enclosing structures.