Refrigerator terminal of the Sea Port

Client: St. Petersburg Sea Port & First Stevedore Company
Location: St. Petersburg
Start: 2008 year
Completion: 2008 year

Lenmontag Project Department was contracted to develop a construction project and a conceptual reconstruction plan for the Sea Port of St. Petersburg. The scope of works included the berth zone from the 17th to the 21st. In this sector of the cargo area, there was designed a refrigerator terminal No. II.

Results: the construction project and the conceptual reconstruction plan were commissioned and transferred to the clients. The documentation includes proposals for redevelopment of the territory, improvement of routing schemes and cargo placement schemes, architectural and engineering solutions for a refrigerator terminal, a project for construction works. We also provided solution for the placement of technical utilities and industrial refrigeration systems of the terminal.