Kursk NPP (power units No. 1, No. 2)

Client: АО «КОНЦЕРН ТИТАН-2»
Location: Курская область
Start: 12.2019
Completion: 06.2020

Installation (with carrying out pre-assembly) frame metal “machine and deaerator departments” Kursk NPP (power units №1, №2)

Installation of metal structures without manufacturing and delivery. The total weight of the structures is 1,308.90 tons.

Frame dimensions: 45m x 90m x 60m.